Hyper-realistic product photography, close-up of an Amazon seller's hand holding a plastic kitchen gadget at a Yiwu booth, background blurred with shelves of colorful household items, sharp focus on product texture and stitching, soft overhead lighting, inviting and trustworthy atmosphere, no text, no brand logo, shot on Canon EOS R5, 50mm, f/2.8, natural light

Yiwu Sourcing Cost Example: Build an Order Budget

Justin • May 29, 2026
Illustrative planning example. This is a hypothetical order budget, not a customer case study, supplier quote or verified profit result. All example costs below are invented inputs to demonstrate the calculation; only the stated Chineseyiwu fee rule is the owner’s published pricing.

Before comparing a supplier’s unit price with a retail selling price, build a budget that separates confirmed costs from missing ones. The useful output is a list of what the order would cost under your assumptions and which quotations you still need. A claimed gross margin is not a substitute for that record.

Set the example order

Assume 1,000 units with a hypothetical product value of $5,000. Under Chineseyiwu’s published rule, procurement on product value above $2,000 is 3%, so the procurement service fee in this illustration is $150. The remaining figures are arbitrary planning inputs, not available service rates.

Budget line Illustrative amount (USD) What to verify for a real order
Products: 1,000 units $5,000 Specification, quantity and what the supplier price includes.
Procurement fee: 3% × $5,000 $150 Final product-value basis and procurement scope.
Samples $120 Sample quantity, revisions and sample freight.
Inspection $180 Location, checks, sampling, reporting and any travel charges.
International freight $650 Cargo measurements, route, delivery scope and exclusions.
Destination handling $250 The receiving and handling charges applicable to your shipment.
Known-cost subtotal in this illustration $6,350 Still excludes unquoted duties, taxes and other costs.

The illustrated subtotal is $6.35 per unit before unquoted costs: $6,350 divided by 1,000 units. It is not a final landed cost. If a line is unquoted, keep it marked as unknown instead of assuming zero. Avoid adding a charge twice if it is already included elsewhere in a quote.

Separate a first-order budget from a repeat-order budget

Tooling, design work, artwork setup and sample development may have a different treatment from recurring product or shipping costs. Ask who owns any tooling or artwork and what a repeat order would require. Keep the one-off amounts visible in the first-order budget rather than hiding them inside an unexplained unit figure.

Why this worksheet does not establish profit

A selling price alone does not establish gross or net margin. You still need the applicable accounting treatment, destination costs and selling expenses. Returns, platform charges, fulfilment, storage, payment charges and advertising can change the result. Use actual records for those lines and have your finance adviser review the treatment where necessary.

For operational planning, keep a cost log with the quote reference, currency, validity, inclusion and responsible party for every line. See the landed-cost guide for further questions to ask before approving an order.

Approve the evidence at each stage

  • Before sourcing: a product brief and a clearly separated service quote.
  • Before production: the approved specification, sample reference and change record.
  • Before dispatch: agreed inspection findings and confirmed packed-cargo details.
  • Before finalising the budget: actual supplier, service, freight and destination invoices.